Inspection Detail
Inspection: 313162505 - Hbs Painting Inc Dba Hoppe Brothers & Sons
Inspection Information - Office: Santa Ana District Office
Site Address:
Hbs Painting Inc Dba Hoppe Brothers & Sons
1018 Marine
Laguna Beach, CA 92651
Mailing Address:
22941 Savi Ranch Pkwy, Yorba Linda, CA 92887
Union Status: NonUnion
SIC:1721
NAICS: 238320/Painting and Wall Covering Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 02/10/2010
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 02/17/2011
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 102587946 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 5 | 5 | ||||
| Current Violations | 5 | 5 | ||||
| Initial Penalty | $0 | $0 | $0 | $600 | $0 | $600 |
| Current Penalty | $0 | $0 | $0 | $600 | $0 | $600 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1530 A01 | 02/10/2010 | 03/15/2010 | $100 | $100 | $0 | - | ||
| 2. | 01002 | Other | 1534 A | 02/10/2010 | 03/15/2010 | $150 | $150 | $0 | - | ||
| 3. | 01003 | Other | 5144 C01 | 02/10/2010 | 03/15/2010 | $100 | $100 | $0 | - | ||
| 4. | 01004 | Other | 5449 B | 02/10/2010 | 03/15/2010 | $150 | $150 | $0 | - | ||
| 5. | 01005 | Other | 5449 D | 02/10/2010 | 03/15/2010 | $100 | $100 | $0 | - |
Investigation Summary
On September 16, 2009, Employee #1, a painter, was applying initial coats of paint to the baseboards and the cabinets in a master bathroom that covered an area of approximately 240 square ft. The mixture of paint included 3 to 5 gallons of Valtec Pre-Catalyzed White Lacquer Undercoat (45 to 50 percent acetone) and 1 to 6 ounces of lacquer thinner (32 to 48 percent acetone). Employee #1 was using an airless paint sprayer (Spraytech Model Number 650) to apply the paint. The grounding contact pin was missing from the sprayer's power cord. The ventilation in the room included a box fan at a window located adjacent to the bathroom, and a portable local exhaust ventilation unit (Grainger, two-speed, 1120 CFM high setting, and 877 CFM low setting) located on the floor about 10 feet away from the bathroom. Employee #1 had applied two coats of the paint mixture, and was on his third application while crouched down at the entrance of the bathroom. Employee #2, his supervisor, was located about 24 ft away patching and sanding. He was also checking Employee #1's work and was available to assist Employee #1. When a flash fire occurred, Employee #2 extinguished it with a fire extinguisher. Employee #1, who was wearing shorts, sustained third-degree burns on both of his legs from the mid-calf to the ankles and second-degree burns on his right arm and hand. Employee #2 sustained respiratory injuries. Both employees were admitted to the Western Medical Center Hospital.
Keywords: BURN, LACQUER THINNER, RESPIRATORY, LACQUER, FIRE, SPRAY PAINTING, PAINT, ARM, HAND, LEG
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 313162505 | Hospitalized injury | Burn/Scald(Heat) | Painters, construction and maintenance | ||
| 2 | 313162505 | Hospitalized injury | Other | Supervisors; painters, paperhangers and plasterers |
Translate