Inspection Detail
Inspection: 307828632 - Herbert Malarkey Roofing Company
Inspection Information - Office: Or-E-Portland - Safety 1 1054111
Site Address:
Herbert Malarkey Roofing Company
3131 N Columbia Blvd
Portland, OR 97217
Mailing Address:
Po Box 17217, Portland, OR 97217
Union Status: Union
SIC:2952
NAICS: 324122/Asphalt Shingle and Coating Materials Manufacturing
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 09/03/2004
Planning Guide: Health-Manufacturing
Emphasis:
Case Closed: 12/22/2004
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $1,500 | $0 | $0 | $0 | $0 | $1,500 |
| Current Penalty | $1,500 | $0 | $0 | $0 | $0 | $1,500 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 701076001 C | 09/24/2004 | 10/04/2004 | $1,500 | $1,500 | $0 | - |
Investigation Summary
At approximately 9:30 a.m. on August 1, 2004, Employee #1 was beginning the process of transferring hot asphalt from a blending tank to a holding tank. The blending tank was nearly filled with hot asphalt which was heated to approximately 385 degrees Fahrenheit. Added into the hot asphalt were styrenic block copolymer pellets are which are known to form flammable hydrocarbons in the presence of heat above 250 degrees Fahrenheit. Employee #1 was standing on an enclosed platform above the tanks and was opening a transfer valve. A flash fire occurred in the blending tank, which had a large top hatch with an unlatched door. He was thrown backwards and struck the transfer pipe. Employee #1 was hospitalized with second-degree burns on both forearms and the left side of his face. One possible ignition source was an elevator lift and chute system that was not grounded and bonded. Another possible ignition source was clumps of un-dissolved pellets that were found conglomerated around the elevator chute entry point due to the upper agitator paddle for the blending tank breaking off several days before the explosion. Per the styrenic block copolymer MSDS, the pellets "contain residual unsaturation which can undergo exothermic oxidative degradation. Accumulation of product in areas exposed to elevated temperatures for extended periods in air may result in self-heating and auto-ignition". A third possible ignition source was the tank transfer valve wheel that was being opened by Employee #1 at the time that the fire occurred. One final factor was the blockage of the tank's vent, which was 90-percent plugged with styrenic pellets, reducing the emergency relief capacity.
Keywords: BURN, FLAMMABLE LIQUID, UNSECURED, FIRE, EXPLOSION, HOT ASPHALT, STYRENE, VALVE, FACE, TANK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 307828632 | Hospitalized injury | Burn/Scald(Heat) | Occupation not reported |
Translate