Inspection Detail
Inspection: 302050950 - Midstate Electric Cooperative Inc
Inspection Information - Office: Or-E-Salem 1054100
Site Address:
Midstate Electric Cooperative Inc
1.5 Mile Se Of Crescent Jctn
Cresent Lake, OR 97425
Mailing Address:
Po Box 127, Lapine, OR 97739
Union Status: Union
SIC:4911
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/12/1999
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 07/20/1999
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $1,250 | $0 | $0 | $0 | $0 | $1,250 |
| Current Penalty | $1,000 | $0 | $0 | $0 | $0 | $1,000 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 701076001 A | 01/27/1999 | 02/01/1999 | $1,000 | $1,250 | $0 | 02/16/1999 | L - State Settlement |
Investigation Summary
A four-person power line crew was replacing the top arm on a utility pole, changing it to a dead-end double arm feeding an underground line. The employees set an auxiliary arm in place under the existing arm and began transferring the 14.4-kilovolt line conductors to the auxiliary arm. During this operation, one of the power line workers contacted an energized section of the auxiliary arm and received an electric shock. He was hospitalized for his injuries.
Keywords: ELEC PROTECT EQUIP, OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, LIVE-LINE TOOL, E PTD, ELEC UTILITY WORK, ELECTRIC SHOCK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 302050950 | Hospitalized injury | Electric Shock | Electrical power installers and repairers |