Inspection Detail
Inspection: 1811157 - Lockheed California Company
Inspection Information - Office: Region 09; San Francisco
Site Address:
Lockheed California Company
2555 Hollywood Way
Burbank, CA 91520
Mailing Address:
, , 00000
Union Status: Union
SIC:3720
NAICS: 0
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/11/1984
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 12/31/1988
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 900548330 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | 2 | |||
| Current Violations | 1 | 1 | 2 | |||
| Initial Penalty | $640 | $0 | $0 | $0 | $0 | $640 |
| Current Penalty | $640 | $0 | $0 | $0 | $0 | $640 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 19100157 E03 | 04/20/1984 | 05/18/1984 | $0 | $0 | $0 | - | ||
| 2. | 02001 | Serious | 5A0001 | 05/25/1984 | 04/13/1984 | $640 | $640 | $0 | - |
Investigation Summary
THE THREE EMPLOYEES WERE PREPARING A UNIT TESTING DEVICE CONSISTING OF FUEL COMPARTMENTS WITH INTERNAL FUEL PIPING AND SWITCHING DEVICES. THE COMPARTMENTS CONTAINED RESIDUAL JP-4 JET FUEL, WITH AN LEL OF .8% BY VOLUME AND A FLASH POINT OF -4% F. WRITTEN SOP INSTRUCTIONS PRESCRIBED CLEANING AND VENTING TO REDUCE THE VAPORS TO LESS THAN 10% OF THE LEL. GAS FREEING WAS TO BE DONE AFTER ALL ELECTRICAL POWER AND ALL OTHER SOURCES OF IGNITION WERE REMOVED FROM THE UNIT AND SURROUNDING AREA. NO SYNTHETIC CLOTHING MATERIALS WAS TO BE ALLOWED IN THE WORK AREA. ALSO, CHECK LISTS WERE TO BE COMPLETED FOR ALL THE ABOVE, PLUS TESTING WAS TO BE ACCOMPLISHED WITH A COMBUSTIBLE GAS INDICATOR. WORK WAS PERMITTED TO PROCEED WITHOUT GAS FREEING AND TESTING, AND WITHOUT A POSITIVE DETERMINATION THAT ALL ELECTRICAL CIRCUITS WERE DEENERGIZED AND THAT WORKERS WERE NOT WEARING SYNTHETIC TYPE CLOTHING. THE RELATIVE HUMIDITY WAS 23% AT 80 DEGREES FARENHEIT. A SPARK, MOST LIKELY FROM AN ELECTRICAL CIRCUIT (28 VOLTS) TO A PRESSURE SWITCH, PROBABLY IGNITED THE VAPORS. CAUSE OF ACCIDENT: SOP WAS NOT FOLLOWED OR ENFORCED.
Keywords: ELECTRIC ARC, FLAMMABLE VAPORS, VENTING, CLEANING, EXPLOSION, JET FUEL, TANK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1811157 | Hospitalized injury | Burn/Scald(Heat) | Occupation not reported | ||
| 2 | 1811157 | Hospitalized injury | Burn/Scald(Heat) | Occupation not reported | ||
| 3 | 1811157 | Hospitalized injury | Burn/Scald(Heat) | Occupation not reported |