Inspection Detail
Inspection: 1475244.015 - Jms Wind Energy, Inc.
Inspection Information - Office: Fort Worth Area Office
Site Address:
Jms Wind Energy, Inc.
1314 Fm 1768
Olney, TX 76374
Mailing Address:
1336 Fm 1768, Olney, TX 76374
Union Status: NonUnion
SIC:
NAICS: 333611/Turbine and Turbine Generator Set Units Manufacturing
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/13/2020
Emphasis: L:Gifall
Case Closed: 10/26/2020
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1588418 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 4 | 4 | ||||
| Current Violations | 4 | 4 | ||||
| Initial Penalty | $20,242 | $0 | $0 | $0 | $0 | $20,242 |
| Current Penalty | $0 | $0 | $0 | $20,242 | $0 | $20,242 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Other | 19100269 L01 III | 06/03/2020 | 07/01/2020 | $5,398 | $5,398 | $0 | 08/24/2020 | F - Formal Settlement | |
| 2. | 01001B | Serious | 19100269 L02 I B | 06/03/2020 | 07/01/2020 | $0 | $0 | $0 | 08/24/2020 | F - Formal Settlement | Citation has been deleted. |
| 3. | 01002A | Other | 19100269 L08 I | 06/03/2020 | 07/01/2020 | $5,398 | $5,398 | $0 | 08/24/2020 | F - Formal Settlement | |
| 4. | 01002B | Serious | 19100269 L08 II | 06/03/2020 | 07/01/2020 | $0 | $0 | $0 | 08/24/2020 | F - Formal Settlement | Citation has been deleted. |
| 5. | 01003A | Other | 19100269 L08 III | 06/03/2020 | 07/01/2020 | $4,048 | $4,048 | $0 | 08/24/2020 | F - Formal Settlement | |
| 6. | 01003B | Serious | 19100269 L08 V | 06/03/2020 | 07/01/2020 | $0 | $0 | $0 | 08/24/2020 | F - Formal Settlement | Citation has been deleted. |
| 7. | 01004A | Other | 19100269 M03 III | 06/03/2020 | 07/01/2020 | $5,398 | $5,398 | $0 | 08/24/2020 | F - Formal Settlement | |
| 8. | 01004B | Serious | 19100269 M03 VI | 06/03/2020 | 07/01/2020 | $0 | $0 | $0 | 08/24/2020 | F - Formal Settlement | Citation has been deleted. |
Investigation Summary
At 9:00 a.m. on May 12, 2020, an employee working as an electronics technician for a wind turbine components manufacturer was decommissioning a power distribution panel (PDP). A live 690-volt cable contacted the front foot plate of the PDP and created an arc flash. The employee sustained burns to his abdomen, upper legs and left arm and was hospitalized.
Keywords: Abdomen, Arm, Burn, Electric Arc, Electric Arc Flash, Electric Shock, Electrical Wire, Electrical panel, Electronic Technicn, Fire, Insufficient Supervision, Leg, Lockout, Lockout/Tagout, PPE, Protective Clothing, Shock, Steel Plate, Wind Turbine, Work Surface
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1475244.015 | 29 | M | Hospitalized injury | Misc. electrical & electronic equipment repairers |
Translate