Inspection Detail
Inspection: 111989968 - Jenkin Construction Co Inc
Inspection Information - Office: Los Angeles District Office
Site Address:
Jenkin Construction Co Inc
324 W. El Segundo Blvd.
El Segundo, CA 90245
Mailing Address:
2650 Lime Ave., Signal Hill, CA 90806
Union Status: Union
SIC:1771
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/29/1992
Planning Guide: Safety-Manufacturing
Emphasis:
Case Closed: 10/13/1993
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 361317159 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 9 | 9 | ||||
| Current Violations | 9 | 9 | ||||
| Initial Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| Current Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1509 B | 04/29/1992 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 2. | 01002 | Other | 3203 A02 | 04/29/1992 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 3. | 01003 | Other | 3203 A03 | 04/29/1993 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 4. | 01004 | Other | 3203 A04 | 04/29/1992 | 05/05/1992 | $0 | $0 | $0 | - | ||
| 5. | 01005 | Other | 3203 A05 | 04/29/1992 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 6. | 01006 | Other | 3203 A06 | 04/29/1992 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 7. | 01007 | Other | 3203 A07 | 04/29/1992 | 05/26/1992 | $0 | $0 | $0 | - | ||
| 8. | 01008 | Other | 1512 C01 | 04/29/1992 | 05/05/1992 | $0 | $0 | $0 | - | ||
| 9. | 01009 | Other | 1512 C03 | 04/29/1992 | 05/05/1992 | $0 | $0 | $0 | - |
Investigation Summary
At approximately 1:00 p.m. on January 23, 1992, at the Chevron USA, Inc., Refinery in El Segundo, CA, Employees #1 through #9 were in a restricted space between the coker drum and the part of the supporting structure known as the 42 ft deck. The coke within the drum was being cut out of the drum with a water lance. The shot coke contents slumped or partially collapsed, causing the large mass of hot material to suddenly come in contact with water flowing down the chute at the bottom of the drum. A flash of steam and/or an explosion ensued. Employees #1 through #9 were burned by a release of steam and/or flame mixed with coke from the coker unit C drum. Employees #1, #4, and #6 through #9 were hospitalized. The investigation continues.
Keywords: BURN, EYE, FIRE, CONSTRUCTION, STEAM, EXPLOSION, COKE DRUM, REFINERY
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 111989968 | Non Hospitalized injury | Burn/Scald(Heat) | Helpers, construction trades | ||
| 2 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Helpers, construction trades | ||
| 3 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Helpers, construction trades | ||
| 4 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Concrete and terrazzo finishers | ||
| 5 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Concrete and terrazzo finishers | ||
| 6 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Concrete and terrazzo finishers | ||
| 7 | 111989968 | Non Hospitalized injury | Burn/Scald(Heat) | Supervisors, n.e.c. | ||
| 8 | 111989968 | Hospitalized injury | Burn/Scald(Heat) | Concrete and terrazzo finishers | ||
| 9 | 111989968 | Non Hospitalized injury | Burn/Scald(Heat) | Helpers, construction trades |