For problems with accessibility in using figures and illustrations, please contact the DOC at 202-693-2020.
Investigation of the April 5, 2011 Flow Equalization Basin Wall Collapse at Wastewater Treatment Plant in Gatlinburg, TN
The east wall of the 30 ft. high concrete equalization basin suddenly separated from the rest of the structure under the hydrostatic pressure, and fell over a one story control room structure killing two employees.
Back to Top