Standard Cited: 19100119 J04 III Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 02042

Citation Type: Willful

Abatement Status:

Initial Penalty: $70,000.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 4

Nr Exposed: 25

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/27/2018 $0.00   Willful  
Penalty Z: Issued 03/08/2010 $70,000.00   Willful  

Text For Citation: 02 Item/Group: 042 Hazard: REFINERY

29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process eq uipment to maintain its mechanical integrity, is not consistent with applicable manufacturers' recommendations and good engineering practices, or more frequentl y determined to be necessary by prior operating experience: a. BP-Husky Refining , LLC - Oregon, Ohio: Thickness measurements at TML 0260, 0310, 0350, 0360, 0410 , 0470, 0475, 0620, 0700, and 0740 on piping circuit 00840 in the Alky 1 unit ar e not taken at intervals that do not exceed the lesser of one half the remaining life determined from the corrosion rate or the specified maximum interval of 5 years for a Class 1 circuit. b. BP-Husky Refining, LLC - Oregon, Ohio: Thickness measurements at T ML 0140, 0150, 0160, 0270, 0350, 0470, 0490, 0500, 0560, and 0580 on piping circ uit 00160 in the FCC unit are not taken at intervals that do not exceed the less er of one half the remaining life determined from the corrosion rate or the spec ified maximum interval of 10 years for a Class 2 circuit. c. BP-Husky Refining, LLC - Oregon, Ohio: Tthickness measurements at TML 0010, 0090, 0120, 0300, and 0 320 on piping circuit 01040 in the Cat Poly unit are not taken at intervals that do not exceed the lesser of one half the remaining life determined from the cor rosion rate or the specified maximum interval of 5 years for a Class 1 circuit. d. BP-Husky Refining, LLC - Oregon, Ohio: Thickness measurements at TML 0010SD, 0020SD, and 0030SD on piping circuit 00430 in the Reformer 1 unit are not taken at intervals that do not exceed the lesser of one half the remaining life determ ined from the corrosion rate or the specified maximum interval of 5 years for a Class 1 circuit. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of th e abatement date, the empoyer must submit documentation that it has abated the h azard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatmen t plan describing the actions it is taking to ensure that it is in compliance wi th the standards for process equipment testing frequencies in accordance with recognized and generally accepted good engineering practices, such as API 570. The abatement plan shall establish dates during the next three months that indicate when the intervals for thickness measurements will be impl emented in accordance with RAGAGEP. Once the plan has been fully implemented, th e employer must submit certification of its full compliance with the standard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.