Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 02041

Citation Type: Willful

Abatement Status:

Initial Penalty: $70,000.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 3

Nr Exposed: 25

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 09/27/2018 $0.00   Willful  
Penalty Z: Issued 03/08/2010 $70,000.00   Willful  

Text For Citation: 02 Item/Group: 041 Hazard: REFINERY

29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on proce ss equipment to maintain its mechanical integrity, do not follow recognized and generally accepted good engineering practices: a. BP-Husky Refining, LLC - Orego n, Ohio: In the FCC and Alky units, the employer does not follow RAGAGEP (recogn ized and generally accepted good engineering practices) when they do not conduct thorough pressure vessel inspections by failing to take thickness readings at a specific designated test point within a TML (thickness measurement location). b . BP-Husky Refining, LLC - Oregon, Ohio: In the FCC and Alky units, the employer does not follow RAGAGEP (recognized and generally accepted good engineering practices ) when they do not conduct thorough piping inspections by failing to take thickn ess readings at a specific designated test point within a TML (thickness measure ment location)/CML (condition monitoring location). c. BP-Husky Refining, LLC - Oregon, Ohio: The employer does not conduct additional piping inspections on the Alky flare header/subheader when historical inspections indicate flare header t hinning and leaks. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated th e hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abat ement plan describing the actions it is taking to ensure that it is in complianc e with the standards for pressure vessels and associated piping in accordance wi th recognized and generally accepted good engineering practices, such as API 570 and 572. The abatement plan shall establish dates during the next three months i ndicating when specific designated test points within a TML will be determined a nd when additional piping inspections associated with known thinning and leaks s hall be completed. Once the plan has been fully implemented, the employer must s ubmit certification of its full compliance with the standard.e

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.