Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 02019A

Citation Type: Willful

Abatement Status:

Initial Penalty: $70,000.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 1

Nr Exposed: 25

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 09/27/2018 $0.00   Willful  
Penalty Z: Issued 03/08/2010 $70,000.00   Willful  

Text For Citation: 02 Item/Group: 019A Hazard: REFINERY

29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document the need for over pressure protection on pressure vessels as required by recogni zed and generally accepted good engineering practices. The Upper Pumparound Cool er (PR543576) is not protected by pressure relieving devices that would prevent the pressure inside the vessel from rising above acceptable limits. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employe r must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actio ns it is taking to ensure that it is in compliance with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protec ted by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months whe n the evaluations and installations of overpressure protection shall be complete d. Once the plan has been fully implemented, the employer must submit certificat ion of its full compliance with the standard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.