Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 02017B

Citation Type: Willful

Abatement Status:

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 1

Nr Exposed: 25

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 09/27/2018 $0.00   Willful  
Penalty Z: Issued 03/08/2010 $0.00   Willful  

Text For Citation: 02 Item/Group: 017B Hazard: REFINERY

29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not ensure PSV-1281, a conventional relief valve, had a back pressure of less than or equal to 10% of its set pressure. This relief device provides inadequate protection to the FCC Feed Drum, and relieves hydrocarbons to the flare. Pursuant to 29 CFR 1903.19, w ithin ten (10) calendar days of the abatement date, the employer must submit doc umentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards including documentation th at each pressure relief valve and associated piping for all process units have b een evaluated and, if necessary, repaired or replaced to ensure backpressure is limited in accordance with recognized and generally accepted good engineering pr actices, such as API Recommended Practice 520/521 and the ASME Boiler and Pressu re Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certificatio n of its full compliance with the standard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close