Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 02015B

Citation Type: Willful

Abatement Status:

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 1

Nr Exposed: 25

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 09/27/2018 $0.00   Willful  
Penalty Z: Issued 03/08/2010 $0.00   Willful  

Text For Citation: 02 Item/Group: 015B Hazard: REFINERY

29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not ensure PSV-136, l ocated in the Alky Unit, is properly designed. PSV-136 provides protection to th e Second Stage Butane Treater Drum by relieving hydrocarbons to the flare and wa s determined to be undersized and does not have an adequate relieving rate durin g relief scenarios. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated t he hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an aba tement plan describing the actions it is taking to ensure that it is in complian ce with the standards for all pressure vessels in the refinery, including docume ntation that each pressure vessel is evaluated and protected by pressure-relievi ng device(s) that is appropriate for the vessel in accordance with recognized an d generally accepted good engineering practices, such as the ASME Boiler and Pre ssure Vessel Code. The abatement plan shall establish dates during the next three months when the e valuations and installation of adequate overpressure protection shall be complet ed. Once the plan has been fully implemented, the employer must submit certifica tion of its full compliance with the standard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.