Violation Detail
Standard Cited: 19260404 B01 I Wiring design and protection.
Inspection Nr: 311593057
Citation: 02005
Citation Type: Other
Abatement Status: I
Initial Penalty:
Current Penalty:
Issuance Date: 07/21/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/26/2010
Gravity: 01
Report ID: 0111700
Contest Date: 08/12/2010
Final Order: 04/26/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/26/2011 | 07/26/2010 | Other | ||
| Penalty | Z: Issued | 07/21/2010 | 07/26/2010 | Other |
Text For Citation: 02 Item/Group: 005 Hazard: CHEMNEP
29 CFR 1926.404(b)(1)(i): Employer did not use either groundfault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites: a.Site - Neither an assured equipment grounding program nor a GFCI were used to protect workers using electrical equipment.
Translate