Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 311593040
Citation: 02001B
Citation Type: Serious
Abatement Status: I
Initial Penalty:
Current Penalty: $7,000.00
Issuance Date: 07/21/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/26/2010
Gravity: 10
Report ID: 0111700
Contest Date: 08/11/2010
Final Order: 09/06/2011
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 09/06/2011 | $7,000.00 | 07/26/2010 | Serious | |
| Penalty | Z: Issued | 07/21/2010 | 07/26/2010 | Willful |
Text For Citation: 02 Item/Group: 001B Hazard: CHEMNEP
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: a.Site - Vessel P-35 was not ventilated prior to allowing welding on the vessel.