Standard Cited: 19100212 A02 General requirements for all machines.
Inspection Nr: 1563487.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/19/2022
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 02/14/2022
Gravity:
Report ID: 0336000
Contest Date:
Final Order: 01/28/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/28/2022 | $0.00 | 02/14/2022 | Other | |
| Penalty | Z: Issued | 01/19/2022 | $0.00 | 02/14/2022 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(2): Machine guard(s) on machine(s) were so installed that they offered accident hazards in themselves: a.) Tonnard Manufacturing Corp.; sanding department - On or about 11/3/21, and at times prior thereto, the expanded metal guard on the Curtis sander had sharp edges at the bottom which created potential laceration hazards. b.) Tonnard Manufacturing Corp.; sanding department - On or about 12/6/21, the new expanded metal guard on the Curtis sander used to cover the entire conveyor guard had sharp edges at the bottom which created potential laceration hazards. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.