Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1547158.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/20/2022
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/15/2022
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 03/03/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/03/2022 | $0.00 | 02/15/2022 | Other | |
| Penalty | Z: Issued | 01/20/2022 | $0.00 | 02/15/2022 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i)(C):Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected (a) On or about 6/17/2021, the period inspection which was conducted on hazardous energy control procedures did not include a review between the inspector and authorized employees.
Translate