Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 M04 V Process safety management of highly hazardous chemicals.

Inspection Nr: 311611081

Citation: 01015

Citation Type: Other

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 5

Nr Exposed: 13

Abatement Date: 03/08/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/27/2018 $0.00   Other  
Penalty Z: Issued 03/08/2010 $5,000.00   Serious  

Text For Citation: 01 Item/Group: 015 Hazard: REFINERY

29 CFR 1910.119(m)(4)(v): The report prepared at the conclusion of the investiga tion of an incident which resulted in, or could have reseasonably resulted in a catastrophic release of highly hazardous chemical in the workplace, did not include any recommendations resulti ng from the investigation team: a.BP-Husky Refining, LLC located in Oregon, Ohio : On or about November 16, 2009, the Incident Report 2003-IR-561854 which involv ed a flare line leak in the Alky 1 unit on or about July 7, 2003, did not includ e any recommendations from the investigation. b.BP-Husky Refining, LLC located i n Oregon, Ohio: On or about November 16, 2009, the Incident Report 2006-IR-18103 45 which involved a leak in the East flare line near the Alky 2 unit on or about April 26, 2006, did not include any recommendations from the investigation. c.B P-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, th e Incident Report 2009-IR-3208733 which involved a leak on the main fare header in the Alky 1 unit on or about August 30, 2009, did not include any recommendations from the investigation. d.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2009-IR-3220578 which involved a f lare line leak in the Alky 1 unit on or about September 2, 2009, did not include any recommendations from the investigation. e.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2009-IR-290644 9 which involved a flange leak in the FCC Stripper bottoms in the FCC 2 unit on or about January 2, 2009, did not include any recommendations from the investiga tion. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be inc luded with your certification. This documentation may include, but is not limited to, evidence o f the purchase or repair of the equipment, photographic or video evidence of aba tement, or other written records.t,

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.