Violation Detail
Standard Cited: 19100305 G01 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1443413.015
Citation: 01008
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $2,892.00
Current Penalty: $1,446.00
Issuance Date: 03/09/2020
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 06/30/2020
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 04/02/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/02/2020 | $1,446.00 | 06/30/2020 | Serious | |
| Penalty | Z: Issued | 03/09/2020 | $2,892.00 | 04/06/2020 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.305(g)(1)(iv): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used: The employer utilized extension cords and flexible cords as a substitute for fixed wiring, affixing them to the building structure and running them through holes in walls.
Translate