Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 568720.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 01/31/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/22/2013
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 02/22/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/22/2013 | $7,000.00 | 02/22/2013 | Serious | |
| Penalty | Z: Issued | 01/31/2013 | $7,000.00 | 02/20/2013 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: The employer had not performed a periodic inspection for lockout procedures on the Pre-Expander IPE-7000P machine in the past year. This machine has electric, steam, and pneumatic energy sources. ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED