Standard Cited: 19100335 A02 II Safeguards for personnel protection.
Inspection Nr: 1714877.015
Citation: 01005
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 04/17/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/04/2024
Gravity: 10
Report ID: 0626000
Contest Date: 05/13/2024
Final Order:
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 05/13/2024 | $16,131.00 | 06/04/2024 | Serious | |
| Penalty | Z: Issued | 04/17/2024 | $16,131.00 | 06/04/2024 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.335(a)(2)(ii): Protective shields, protective barriers, or insulating materials were not used to protect each employee from shock, burns, or other electrically related injuries while that employee was working near exposed energized parts. On or about December 2, 2023, and at times prior thereto, employees conducted repair operations to the Auxiliary "A" transformer cooling system, and protective shields, protective barriers, or insulating materials were not used to protect each employee from shock and burns.