Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1515986.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,192.00
Current Penalty: $4,915.20
Issuance Date: 06/28/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/23/2021
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 07/27/2021
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/27/2021 | $4,915.20 | 07/23/2021 | Serious | |
| Penalty | Z: Issued | 06/28/2021 | $8,192.00 | 07/23/2021 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.219(f)(3): Sprockets and chains which were seven (7) feet or less above floors or platform were not enclosed. On or about February 22, 2021, employees were potentially to hazards created by ingoing nip points, in that the sprocket and chain assembly for the Nib Process roller and process oven were not guarded by a full enclosure.