Violation Detail
Standard Cited: 19100119 N Process safety management of highly hazardous chemicals.
Inspection Nr: 1400751.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,626.00
Current Penalty: $3,375.60
Issuance Date: 10/11/2019
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 10/18/2019
Gravity: 1
Report ID: 0625400
Contest Date:
Final Order: 01/21/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/21/2020 | $3,375.60 | 10/18/2019 | Serious | |
| Penalty | Z: Issued | 10/11/2019 | $5,626.00 | 10/18/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(n): The employer did not establish and implement an emergency plan for the entire plant in accordance with the provisions of 29 CFR 1910.38. On or about 14 May 2019, and at times prior thereto, the windsock for the production area mounted on the crude tower was torn and damaged, exposing the workers in the area to the hazard of a vapor-cloud fire or explosion.
Translate