Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 311611081

Citation: 01004B

Citation Type: Serious

Abatement Status:

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/08/2010

Nr Instances: 25

Nr Exposed: 250

Abatement Date: 04/19/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty D: Govt Dismissed 09/27/2018 $0.00   Serious  
Penalty Z: Issued 03/08/2010 $0.00   Serious  

Text For Citation: 01 Item/Group: 004B Hazard: REFINERY

29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment th at were outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refinin g, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Top (PR 543018) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. b.BP-Husky Refining, LLC - Oregon, Ohio: On or about Sep tember 10, 2009, the Compressor Discharge Condenser-Btm (PR 543019) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. c.BP-Husky Ref ining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discha rge Condenser-Top (PR 543020) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. d.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Com pressor Discharge Condenser-Btm (PR 543021) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. e.BP-Husky Refining, LLC - Oregon, Ohi o: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Top (P R 543023) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. f.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Btm (PR 543024) in the Alky 1 unit was d eficient, in that, it did not have a grounding cable. g.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Overhead Condense r-East (PR 543027) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. h.BP-Husky Refining, LLC - Oregon, Ohio : On or about September 10, 2009, the Debutanizer Reboiler (PR 543028) in the Al ky 1 unit was deficient, in that, it did not have a grounding cable. i.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Ov erhead Condenser-West (PR 543048) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. j.BP-Husky Refining, LLC - Oregon, Ohio: On or a bout September 10, 2009, the Total Alkylate Cooler (PR 543238) in the Alky 1 uni t was deficient, in that, it did not have a grounding cable. k.BP-Husky Refining , LLC - Oregon, Ohio: On or about September 10, 2009, the Condensate Effluent Ex changer-Top (PR 543596) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. l.BP-Husky Refining, LLC - Oregon, Ohio : On or about September 10, 2009, the Condensate Effluent Exchanger-Btm (PR 5435 97) in the Alky 1 unit was deficient in, that, it did not have a grounding cable . m.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the A cid Settler/Dry Drum (PR 511383) in the Alky 2 unit was deficient, in that, it d id not have a grounding cable. n.BP-Husky Refining, LLC - Oregon, Ohio: On or ab out September 10, 2009, the Isobutane Coalescer (PR 511392) in the Alky 2 unit w as deficient, in that, it did not have a grounding cable. o.BP-Husky Refining, L LC - Oregon, Ohio: On or about September 10, 2009, the Butane Recycle Coalescer (PR 511394) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. p.BP-Husky Refining, LLC - Oregon, Ohio: On or a bout September 10, 2009, the Effluent Coalescer (PR 511399) in the Alky 2 unit w as deficient, in that, it did not have a grounding cable. q.BP-Husky Refining, L LC - Oregon, Ohio: On or about September 10, 2009, the Caustic Storage Drum (PR 511481) in the Alky 2 unit was deficient, in that, it did not have a grounding c able. r.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, t he Depropanizer Feed Treater (PR 511518) in the Alky 2 unit was deficient, in th at, it did not have a grounding cable. s.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Rerun Tower Bottoms Reboiler (PR 540007) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. t.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Feed Chiller (PR 540061) in the Alky 2 unit was de ficient, in that, it did not have a grounding cable. u.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Recycle Chiller (PR 543558) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. v.BP -Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the DIB Ove rhead Receiver (PR 511443) in the Alky 3 unit was deficient, in that, it did not have a grounding cable. w.BP-Husky Refining, LLC - Oregon, Ohio: On or about Se ptember 10, 2009, the Hydrocarbon Degasser (PR 511743) in the Alky 3 unit was deficient, in that, it d id not have a grounding cable. x.BP-Husky Refining, LLC - Oregon, Ohio: On or ab out September 10, 2009, the employer did not ensure the Safety Instrumented Syst em bypass functions overseen in the central control room were password protected or controlled with a keyed lock. y.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure an intervening valve betw een the relief device and the Sour Gas knock out drum (PR511923) was car sealed open. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be inc luded with your certification. This documentation may include, but is not limite d to, evidence of the purchase or repair of the equipment, photographic or video evidence of ab atement, or other written records.t,

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close