Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1592060.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,351.00
Current Penalty: $3,200.00
Issuance Date: 10/24/2022
Nr Instances: 2
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0215600
Contest Date: 11/09/2022
Final Order: 03/11/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 03/11/2024 | $3,200.00 | Serious | ||
| Penalty | C: Contested | 11/16/2022 | $4,351.00 | Serious | ||
| Penalty | Z: Issued | 10/24/2022 | $4,351.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(g)(4)(i):Guardrail systems were not installed along all open sides and ends of platforms. A) On or about April 25, 2022 at 118-37 Metropolitan Avenue, Kew Gardens, NY 11415 The platform of a suspended scaffold used by employees while performing exterior brick work (i.e. brick grinding, brick-pointing, lintel work) on the 3rd and 4th floors of a residential apartment building was observed missing a guardrail system along all open sides and platform ends exposing employees to fall hazards. B) On or about April 26, 2022 at 118-37 Metropolitan Avenue, Kew Gardens, NY 11415 The platform of a suspended scaffold accessed by an employee on April 26, 2022 was observed missing a guardrail system along all open sides and platforms ends resulting in an employee falling approximately twenty (20) feet to the lower level on April 26, 2022. ABATEMENT CERTIFICATION IS NOT REQUIRED