Violation Detail
Standard Cited: 19100217 C02 I Mechanical power presses.
Inspection Nr: 1546274.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/22/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/22/2021
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 12/09/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/09/2021 | $0.00 | 12/22/2021 | Serious | |
| Penalty | Z: Issued | 11/22/2021 | $0.00 | 12/22/2021 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.217(c)(2)(i): Every point of operation guard did not meet the following design, construction, application, and adjustment requirements: On or about July 16, 2021, an employee operating the Roper Whitney Pexto Press to make filter straps received an amputation due to the lack of point of operation guarding.
Translate