Violation Detail
Standard Cited: 19100333 C03 III B 2 Selection and use of work practices
Inspection Nr: 1407471.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/02/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/18/2020
Gravity: 10
Report ID: 0729700
Contest Date:
Final Order: 11/15/2019
Related Event Code (REC): A
Emphasis:
Substance: 8870
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/15/2019 | $0.00 | 02/18/2020 | Serious | |
| Penalty | Z: Issued | 10/02/2019 | $0.00 | 10/25/2019 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.333(c)(3)(iii)(B)(2): The equipment being used was not located so that no uninsulated part of its structure (that portion of the structure that provides a conductive path to employees on the ground) can come closer to the line than permitted in paragraph (c)(3)(iii) of this section: The employer is failing to protect employees from electrical shock hazards when performing well and pump maintenance operations. This was most recently documented, on or about 6/12/2019, at the jobsite located at Rd N 80 (39.466304, -100.575538) Selden KS 67757. The employer did not ensure the truck mounted Smeal Hydraulic 6T derrick was located as to prevent it from being operated adjacent to unguarded, energized overhead lines.
Translate