Violation Detail

Standard Cited: 19100119 D03 I Process safety management of highly hazardous chemicals.

Inspection Nr: 311611081

Citation: 01003

Citation Type: Serious

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 03/08/2010

Nr Instances: 34

Nr Exposed: 25

Abatement Date: 03/22/2010

Gravity: 10

Report ID: 0524700

Contest Date: 03/31/2010

Final Order: 09/27/2018

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 09/27/2018 $5,000.00 01/24/2019 Serious  
Penalty Z: Issued 03/08/2010 $5,000.00   Serious  

Text For Citation: 01 Item/Group: 003 Hazard: REFINERY

29 CFR 1910.119(d)(3)(i): Process safety information pertaining to the equipment in the process did not include the elements specified in 29 CFR 1910.119(d)(3)( i)(A) through (H): a.BP-Husky Refining, LLC - Oregon, Ohio: On or about Septembe r 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The equipment connected to pipe 1/2"-25-FA-11 which leads to tank 599 had a line that was not labeled "to tank 599", the regulator bypass which had been removed was still on the diagram and the flow control valve was shown as a pressure control valve. b .BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the empl oyer did not ensure that numerous P&ID diagrams were accurate. The 3/4" block va lve and pressure gauge connected to the 2"-C-106-K pipe to the top of tank 653 w ere missing. c.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The double block valve and drain on the 3/4" sewer line connected to pipe 2"-C-106- K were missing. d.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the emp loyer did not ensure that numerous P&ID diagrams were accurate. The diagram refl ected an interconnection between tank 653 and 654 running to Alkalyte recovery ( 734 tank) that did not exist. e.BP-Husky Refining, LLC - Oregon, Ohio: On or abo ut September 10, 2009, the employer did not ensure that numerous P&ID diagrams w ere accurate. The 3" block valves and bleeders installed on the manway on tanks 500653 and 500654 were missing. f.BP-Husky Refining, LLC - Oregon, Ohio: On or a bout September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 3/4" line and block valve leading to the acid pit connected to 6"-7-7-k pipe were missing. g.BP-Husky Refining, LLC - Oregon, Ohio: On or ab out September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 3/4" bloc k valve pressure gauge and bleed connected to pipe 4"-Z-7-K IC4/Acid line were n ot on the proper side of the 4" block valve on the diagram. h.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 3/4" block valve and bleed line in the 3" line from the top of the recycle isobutene coalescer were missing. i.B P-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employ er did not ensure that numerous P&ID diagrams were accurate. The 3/4" block valv e and bleed line in the 6-Z-7-K circulating acid line were missing. j.BP-Husky R efining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did no t ensure that numerous P&ID diagrams were accurate. The 33-62-D14 diagram indicated that the block valve leading up to PSV 566 was car sealed open when it was not. k.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate . The 3-64-D2A diagram did not identify the Steam Separator (PR11069) as being o ut of service or that intervening valves were car sealed open. l.BP-Husky Refini ng, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ens ure that numerous P&ID diagrams were accurate. The 3-64-D2A diagram did not iden tify the 1" valve on the discharge line from the Steam Separator (PR11069) as be ing removed. m.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 3-64-D6 d iagram did not show a car sealed open intervening block valve on the steam line going to PSV 1390. n.BP-Husky Refining, LLC - Oregon, Ohio: On or about Septembe r 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurat e. The 26-62-D20 diagram did not show a car sealed open intervening block valve going to PSV 121. o.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate . The 26-62-D20 diagram did not show a car sealed open intervening block valve o n the line going to PSV 145. p.BP-Husky Refining, LLC - Oregon, Ohio: On or abou t September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 26-62-D29 diagram did not show intervening block valves on lines going to PSVs 114, 126, 127 and 146 as being car sealed open. q.BP-Husky Refining, LLC - Oregon, Ohio: O n or about September, 10, 2009, the 26-62- D30 diagram did not show intervening block valves on lines going to PSVs 147 and 148 from the Fluid Coupling Oil Cool er (PR543063 & PR543064) as being car sealed open. r.BP-Husky Refining, LLC - Or egon, Ohio: On or about September 10, 2009, the employer did not ensure that num erous P&ID diagrams were accurate. The 27-62-D8 diagram did not show an interven ing block valve between the Depropanizer Feed Treater Drum (PR511518) and PSV 44 7 as being car sealed open. s.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The 27-62-D19 diagram did not show an intervening block valve between the DeC4 Overhead line a nd PSV414 as being car sealed open. t.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diag rams were accurate. The diagram did not show an intervening block valve between the Debutanizer Reboiler (PR543083) and PSV 418 as being car sealed open. u.BP-H usky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure that numerous P&ID diagrams were accurate. The diagram did not sh ow the removal of an intervening valve from the line leading to PSV 434. v.BP-Hu sky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer d id not ensure that numerous P&ID diagrams were accurate. The 3-62-D4B diagram did not show the three intervening valves between each of the three pair s of 2nd Stage Coolers and the 2nd Stage Drum as being car sealed open. w.BP-Hus ky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer di d not ensure that numerous P&ID diagrams were accurate. The 3-62-D48 diagram did not show the removal of the pressure safety valve between one of the 2nd Stage Coolers (PR-543562) and the 2nd Stage Drum. x.BP-Husky Refining, LLC - Oregon, O hio: On or about September 10, 2009, the employer did not ensure that numerous P &ID diagrams were accurate. The 3-62-D48 diagram did not show three 12" x 10" re ducers downstream from the three pairs of 2nd Stage Coolers. One reducer actuall y exists where a 12" line is reduced to a 10" line, which splits into three 10" lines. y.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the emp loyer did not maintain an R-1 form for deposit welds on the Acid Reactor (PR 511 480). z.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, t he employer did not ensure there was a nameplate on the original portion on the FCC Reactor (PR 511024). aa.BP-Husky Refining, LLC - Oregon, Ohio: On or about S eptember 10, 2009, the employer did not ensure there was a nameplate visible on the Alky 2 Effluent Coalescer (PR 511399). In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.