Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1623528.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,349.00
Current Penalty: $2,733.00
Issuance Date: 03/15/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/27/2023
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 04/04/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/04/2023 | $2,733.00 | 03/27/2023 | Serious | |
| Penalty | Z: Issued | 03/15/2023 | $3,349.00 | 03/27/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. Location: a) Supported scaffold on the north side of the building: On or about September 20, 2022, employees installed a winch hoist, for material hoisting, on the top tier platform of the scaffold. Subsequently, the employees removed two planks from the scaffold platform underneath the hoist, to provide an opening to hoist material. The employer did not have a competent person that inspect the scaffold before the work shift and after the hoist was installed and the planks were removed.