Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1549183.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,770.00
Current Penalty: $4,273.50
Issuance Date: 02/17/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/16/2022
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 03/14/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/14/2022 | $4,273.50 | 05/16/2022 | Serious | |
| Penalty | Z: Issued | 02/17/2022 | $7,770.00 | 03/16/2022 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(A):Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) Warehouse - The employer did not ensure that flexible cords were not used as a substitute for permanent wiring when energizing the power the LiftMaster Logic 5.0 Commercial Door opener and not on a dedicated circuit, thus exposing employees to electrical and or fire hazards. Observed on or about 18 AUG 2021.