Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1416046.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/23/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/18/2019
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 10/15/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/15/2019 | $0.00 | 10/18/2019 | Serious | |
| Penalty | Z: Issued | 09/23/2019 | $0.00 | 10/18/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed: (a) Prime Coater Room: On July 17, 2019 and times prior, the employer did not conduct an annual periodic inspection between an inspector and authorized employee to ensure that the employee(s) followed the energy control procedures for the coil coater has multiple energy sources, 460 volt electrical and 80 psi pneumatic pressure.