Violation Detail
Standard Cited: 19260850 C Preparatory operations.
Inspection Nr: 1389471.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/24/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/30/2019
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 10/07/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/07/2019 | $0.00 | 09/30/2019 | Serious | |
| Penalty | Z: Issued | 09/24/2019 | $0.00 | 09/30/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.850(c): All electric, gas, water, steam, sewer, and other service lines were not shut off, capped, or otherwise controlled, outside the building line before demolition work was started. In each case, any utility company which was involved was not notified in advance. a) Jobsite: 11601 Roosevelt Blvd, Philadelphia, Main Electric Substation - The employer did not ensure that all electric service lines outside the building were shut off before demolition work started exposing employees scrapping a 13.2 kv electrical cabinet to electrocution and shock hazards. Noted on or about 3/29/19.