Violation Detail
Standard Cited: 19100179 N03 XI Overhead and gantry cranes.
Inspection Nr: 1243445.015
Citation: 01002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/17/2017
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 08/23/2017
Gravity:
Report ID: 0521400
Contest Date:
Final Order: 08/08/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/08/2017 | $0.00 | 08/23/2017 | Other | |
| Penalty | Z: Issued | 07/17/2017 | $0.00 | 08/23/2017 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.179(n)(3)(xi): When starting the bridge and when the load or hook approaches near or over personnel, the warning signal shall be sounded: Northeast, saw department, single shipping and receiving dock, Demag 10 Ton serial no. 95433 overhead bridge crane: on or about June 21, 2017, installed horn was not sounded when starting the bridge to provide advance warning for personnel of the approaching load in the travel path. Employees using remote controller and other working in the area were exposed to swinging load struck-by hazards during regular load handling tasks including unloading steel bundles. Abatement documentation is required for this item in accordance with the requirement of 29 CFR 1903.19(d).
Translate