Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1797276.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $13,895.00
Issuance Date: 04/03/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/20/2025
Gravity: 10
Report ID: 0728900
Contest Date:
Final Order: 05/05/2025
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/05/2025 | $13,895.00 | 05/20/2025 | Serious | |
| Penalty | Z: Issued | 04/03/2025 | $16,550.00 | 04/23/2025 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: On or about January 6, 2025, at the worksite located at 1131 Dakota Avenue, Dakota City, Nebraska, employees engaged in maintenance activities were exposed to caught-in and crushing hazards. The employer did not ensure periodic review for the Newcastle Load Transfer machine, serial number 14134, included a review of the procedure with all employees authorized to lockout/tagout the machine.