Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1517390.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $12,288.00
Current Penalty: $8,602.00
Issuance Date: 03/25/2021
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/01/2021
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 04/16/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/16/2021 | $8,602.00 | 06/01/2021 | Serious | |
| Penalty | Z: Issued | 03/25/2021 | $12,288.00 | 04/29/2021 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about 2/25/2021, the employer failed to ensure that the lockout/tagout program for machinery including, but not limited to the Warner & Swasey Turret lathe #5, was periodically inspected. Energy sources include, but are not limited to electric, pneumatic, and mechanical.