Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1416046.015
Citation: 01002A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,472.00
Current Penalty: $6,630.40
Issuance Date: 09/23/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/18/2019
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 10/15/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/15/2019 | $6,630.40 | 10/18/2019 | Serious | |
| Penalty | Z: Issued | 09/23/2019 | $9,472.00 | 10/18/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: (a) Prime Coater Room: On July 17, 2019 and times prior, the employer has not developed a specific energy control procedure for the coil coater for employees that conduct servicing and maintenance, such as roll changes. The coil coater has multiple energy sources, 460 volt electrical and 80 psi pneumatic pressure.
Translate