Violation Detail
Standard Cited: 19100119 D03 I F Process safety management of highly hazardous chemicals.
Inspection Nr: 1759654.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $6,913.00
Current Penalty: $6,913.00
Issuance Date: 01/02/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 02/03/2025
Gravity: 1
Report ID: 0627100
Contest Date: 01/24/2025
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 01/28/2025 | $6,913.00 | 02/03/2025 | Serious | |
| Penalty | Z: Issued | 01/02/2025 | $6,913.00 | 02/03/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(d)(3)(i)(F): Process safety information (PSI) pertaining to the equipment in the process did not include design codes and standards that were employed: On or about July 3, 2024, at General Dynamics Ordnance and Tactical Systems (GD-OTS) facility in Hampton Arkansas, the employer did not document employed design codes and standards for process safety management (PSM) covered process equipment, such as but not limited to FillPro loader.
Translate