Violation Detail
Standard Cited: 19260602 D Material handling equipment.
Inspection Nr: 1564152.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $2,926.00
Current Penalty: $1,000.00
Issuance Date: 12/21/2021
Nr Instances: 3
Nr Exposed: 3
Abatement Date: 02/09/2022
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 01/19/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/19/2022 | $1,000.00 | 02/09/2022 | Serious | |
| Penalty | Z: Issued | 12/21/2021 | $2,926.00 | 02/09/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.602(d):The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l):Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178. Demolition Area: On or about November 17, 2021, employees were operating forklifts, skid steers, and lulls without training and evaluation.