Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1528430.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,461.00
Current Penalty: $3,823.00
Issuance Date: 10/15/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/01/2021
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 11/10/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/10/2021 | $3,823.00 | 11/01/2021 | Serious | |
| Penalty | Z: Issued | 10/15/2021 | $5,461.00 | 11/01/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d):The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): On or about April 27, 2021, an employee suffered crushing injuries to abdominal area when the Special Purpose Personnel Elevator (SPPE) unexpectedly moved and the employee was caught between the guardrail and a structural. The employer failed to implement energy control application steps as the SPPE was not isolated from the electrical energy source [per the 1910.147(d)(3) requirements]. As a result, the remaining applicable energy control elements, involving LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from SPPE hazards.