Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1415094.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,304.00
Current Penalty: $3,182.40
Issuance Date: 09/20/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/07/2019
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 10/02/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/02/2019 | $3,182.40 | 10/07/2019 | Serious | |
| Penalty | Z: Issued | 09/20/2019 | $5,304.00 | 10/07/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: (a) 803 Pineview Dr., Hattiesburg MS - On or about July 10, 2019 the employer did not ensure, by observation or instrumentation, that the electrical in the crawl space below the house was de-energized and grounded prior to permitting employee(s) to perform work in the crawl space, exposing employees to an electrical shock hazard.
Translate