Violation Detail
Standard Cited: 19260300 B01 General requirements.
Inspection Nr: 1410689.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,978.00
Current Penalty: $2,000.00
Issuance Date: 09/16/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/10/2019
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 10/18/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/18/2019 | $2,000.00 | 10/10/2019 | Serious | |
| Penalty | Z: Issued | 09/16/2019 | $3,978.00 | 10/10/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: (a) SW Corner of US Highway 20/26 and Middleton Rd.: On or about June 24, 2019 and at times prior, employees operate an American Auger Quick Split 42-600 horizontal boring machine to remove the spoils of a 27 inch casing that had been pushed under a roadway. Note: Abatement certification and documentation is required for this item.
Translate