Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1347307.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $6,467.00
Issuance Date: 12/13/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/01/2019
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 01/17/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/17/2019 | $6,467.00 | 02/01/2019 | Serious | |
| Penalty | Z: Issued | 12/13/2018 | $12,934.00 | 02/01/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures (a) Location - 141 Main Street, Marlborough, NH: On or about 9/18/18, energy control procedures did not include specific protocols for testing home heating equipment to verify that liquefied petroleum gas (LPG) vapors were not present prior to servicing.
Translate