Violation Detail
Standard Cited: 19100263 C03 Bakery equipment.
Inspection Nr: 1347267.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,805.00
Current Penalty: $8,964.00
Issuance Date: 10/26/2018
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 11/23/2018
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 11/27/2018
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/27/2018 | $8,964.00 | 11/23/2018 | Serious | |
| Penalty | Z: Issued | 10/26/2018 | $12,805.00 | 11/23/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.263(c)(3): Sprocket(s) and V-belt drive(s) of bakery machinery located within reach from platform(s) or passageway(s) or located within 8 feet 6 inches from the floor were not completely enclosed: (a) PROCEESING ROOM - Employees climbed under the Twisty machine to remove pretzel dough that had built up and were exposed to in-running nip points from six unguarded chain and sprocket drives, on or about September 4, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate