Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1269690.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,889.00
Current Penalty: $2,933.40
Issuance Date: 11/27/2017
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 01/31/2018
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 12/20/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2017 | $2,933.40 | 01/31/2018 | Serious | |
| Penalty | Z: Issued | 11/27/2017 | $4,889.00 | 12/21/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employees were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Employees engaged in operating/running the elevator activities at the East and West Annex floor were exposed to fire hazards in case of emergency and power loss in that the emergency door was locked by a bolt. Employees were exposed to egress hazards in that the exit route door required removal of a tool to open. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.