Standard Cited: 19100147 D05 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1232644.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 11/02/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/22/2017
Gravity:
Report ID: 0627510
Contest Date: 12/07/2017
Final Order: 03/23/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/23/2018 | $12,675.00 | 11/22/2017 | Other | |
| Penalty | C: Contested | 12/07/2017 | $12,675.00 | 11/22/2017 | Serious | |
| Penalty | Z: Issued | 11/02/2017 | $12,675.00 | 11/22/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(5)(ii): Where there was a possibility of re-accumulation of stored energy to a hazardous level, verification of isolation was not continued until the servicing or maintenance was completed, or until the possibility of such accumulation no longer existed. On or about May 3, 2017, and times prior thereto, employer exposed employees to hazardous energy when they did not remove all employees from the work area to ensure that all employees have been safely positioned or removed when testing the lockout procedures for the XV484 valve.