Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1546175.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/08/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/30/2021
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 11/18/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/18/2021 | $0.00 | 12/30/2021 | Serious | |
| Penalty | Z: Issued | 10/08/2021 | $0.00 | 11/29/2021 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Rigidply Rafters - The employer did not conduct annual periodic inspections of the energy control procedures and the employees utilizing the procedures on equipment such as but not limited to the Mann- Russell electronic generator, beam presses and Lam stacker exposing employees to hazards related to the unexpected start up or release of stored energy, on or about April 16, 2021. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate