Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 1492947.015
Citation: 01001B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/28/2020
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/24/2020
Gravity: 5
Report ID: 0729700
Contest Date:
Final Order: 11/12/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/12/2020 | $0.00 | 11/24/2020 | Other | |
| Penalty | Z: Issued | 10/28/2020 | $0.00 | 11/24/2020 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.251(e)(8)(iii): Synthetic web slings were not immediately removed from service when snags, punctures, tears or cuts were present. At the jobsite located at the bridge construction over the Arkansas River in Nickerson, KS, employees were exposed to struck-by hazards. Employees engaged in material handling operations were moving material with defective rigging in that the rigging had excessive wear in the webbing, exposing employees to struck-by hazards.
Translate