Violation Detail
Standard Cited: 19260503 A02 II Training requirements.
Inspection Nr: 1386991.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/06/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/24/2019
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 05/31/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/31/2019 | $0.00 | 06/24/2019 | Serious | |
| Penalty | Z: Issued | 05/06/2019 | $0.00 | 05/23/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.503(a)(2)(ii): The employer did not assure that each employee, as necessary, had been trained by a competent person in the correct procedures for erecting, maintaining, disassembling and inspecting the fall protection systems to be used: (a) 3214 Market House Lane Mechanicsburg, PA - The employer did not train employees in the correct procedures for fall protection systems that are required to be used while installing insulation, thereby exposing employees to a fall of approximately 22 feet to the lower level, on or about March 20, 2019. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.