Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1251982.015
Citation: 01001B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/04/2018
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 01/22/2018
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 02/12/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/12/2018 | $0.00 | 01/22/2018 | Other | |
| Penalty | Z: Issued | 01/04/2018 | $0.00 | 01/22/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: (a) VA Medical Center - On or about July 28, 2017 employee(s) removed cover from an energized 480v panel to install new circuit breaker. Live parts were not guarded and employees were not wearing personal protective equipment for arc flash hazard.