Violation Detail
Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1475244.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,398.00
Current Penalty: $5,398.00
Issuance Date: 06/03/2020
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 07/01/2020
Gravity:
Report ID: 0636900
Contest Date: 08/24/2020
Final Order: 09/23/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/23/2020 | $5,398.00 | 07/01/2020 | Other | |
| Penalty | C: Contested | 08/24/2020 | $5,398.00 | 07/01/2020 | Serious | |
| Penalty | Z: Issued | 06/03/2020 | $5,398.00 | 07/01/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment were not considered and treated as energized before they had been deenergized in accordance with paragraph (d) or (m) of this section. At a site located at 1314 FM 1768, Olney, Texas; the employer did not ensure, employees working on power distribution panels, treat them as being energized, exposing them to arc flash hazards.