Violation Detail
Standard Cited: 19150089 C01
Inspection Nr: 1462737.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,940.00
Current Penalty: $3,470.00
Issuance Date: 05/04/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/12/2020
Gravity:
Report ID: 0936300
Contest Date:
Final Order: 06/02/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/02/2020 | $3,470.00 | 05/12/2020 | Other | |
| Penalty | Z: Issued | 05/04/2020 | $6,940.00 | 05/12/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1915.89(c)(1): The employer did not ensure the use of a lock to prevent energization or startup, or the release of hazardous energy, before any servicing was started. On February 4, 2020, on the MATTS Vessel: A fan power disconnect was not locked when employees performed scheduled maintenance on the fan. Employees were exposed to amputation hazards